A 400 mm cast iron heating main under a tram line had three pinhole leaks. Excavation meant closing the street for a week. Two repair clamps and one night of work solved it.
Old cast iron fails quietly. In this case three pinholes had been weeping for months, and the operator had been topping up the network daily to hold pressure.
The pipe sits 1.4 meters under a tram right of way, so excavation would have meant a road closure, tram diversion and a week of permits. We proposed a two-piece ductile iron repair clamp with a 300 mm wide EPDM gasket, rated for 110 °C continuous, installed through a single 800 mm access pit.
The clamps were fitted in two hours and torqued to spec. The pit was backfilled before the first tram. Leak rate went to zero and the make-up water demand on that branch dropped by 90 percent.
Send the diameter, working pressure and what flows inside. We reply with a specification and price within one working day.